Session Detail

« Conference  //  « Session Listings By Day

Thursday, September 29, 2022  |  8:30 AM - 9:30 AM

Open to Conference Attendees Only

LLUMC project tracked 59,000 inspections and maintain a 91% success rate

SPEAKERS
 
Tyler Bashlor
Owner, Strategic Building Services
 
Eric Hoffman
Vice President, McCarthy Building Companies, Inc
 
Eric Schilt
Vice President, Loma Linda University Health
 
Diana Silva
Director of Customer Operations, FreightTrain

The University of Loma Linda Medical Center opened its doors to a 983,000 Sq Ft hospital consisting of a pediatric tower with 96 beds and an adult tower with 336 beds. HCAI reviewed 60,000 inspections to receive Certificate of Occupancy. The number of inspections placed significant demands on the team. It would not have been possible without FreightTran QCView, an automated solution for tracking and reporting the inspection status. McCarthy used the visualization and reporting capabilities of QCView to keep the project on track. The Location reference Drawing was utilized for inwall inspections to markup walls. Subs used QCView’s Visual Fragnet map to create overhead inspection requests. These tools provide real-time, visual status updates that enable the team to see the status of the project. SBS was the Inspector of Record and found QCView’s ability to associate TIO’s, RFI’s, and submittals with each inspection to be invaluable to ensure accurate reporting of the inspection status.

LEARNING OBJECTIVES
 
1: Plan for success
2: Measure Inspection Project Performance
3: Resolve Issues as they arise
4: Project Communication